Street lights, tunnel lights and outdoor floodlights
LH-VT-O01 · Outdoor lighting
PURCHASE & CONSULTATION

Comprehensive quality testing for outdoor lighting

In addition to basic safety and photometric/electrical performance, assess ingress protection, high and low temperatures, damp heat, UV exposure and corrosion risks according to the installation environment.

Applicable products · Comprehensive quality testing

Street lights · Garden lights · Floodlights · Wall washers · In-ground lights · Outdoor wall lights

Suggested samples 5 samples recommended, including a sample for disassembly
Indicative lead time 15–25 working days

Contact us to confirm pricing and delivery terms

Start by discussing product specifications, service scope and required deliverables.

TEST SCOPE

What does this programme assess?

  • Basic safety and photometric/electrical performance
  • Confirmation of the IP dust and water ingress test programme
  • High/low temperature, damp heat and thermal shock
  • Screening for UV, salt spray or corrosion risks
  • Surge, installation and abnormal operating conditions
DELIVERABLES

What will you receive?

  • Definition of the operating environment and protection objectives
  • Laboratory pre-assessment and extended test schedule
  • Analysis of failed samples and corrective actions
  • Retest conclusions and release recommendations
STANDARD ROUTE

Standards and assessment approach

The references below are starting points, not automatic conclusions about applicability. The test plan and applicable editions will be agreed for the product construction, voltage, installation method and target market.

  • IEC 60598-1 and particular requirements applicable to outdoor luminaires
  • IEC 60529 ingress protection ratings
  • Target-market electrical safety, EMC and environmental conditions
PROJECT START

Agree your programme in three steps.

01

Provide the basic information

Product images, specifications, version details, target market, known issues and intended launch date.

02

Confirm scope and quotation

Agree tests, conditions, samples, timing, external costs and deliverables.

03

Establish the baseline and start

Confirm the product version and acceptance criteria, then create a traceable record from the initial baseline.

NEED A DIFFERENT PATH?

Other target markets or specific risks?

Send your target markets, installation environment, functional modules and existing certificates together.

Review your enquiry →